Turner Street Metal Standing Seam Roof Project

Roofing Area – 500mtr2

Project Overview

Permicoat Ltd successfully completed a significant roofing project on a 500m² metal standing seam roof located in the bustling Manchester city centre on Turner Street. This project demonstrated our expertise in overcoming complex logistical challenges and delivering high-quality results that align with our company’s standards.

Project Details

  • Site: Turner Street, Manchester City Centre
  • Roof Area: 500m²
  • Product Used: Sika Liquid Plastics
  • Duration: Completed on schedule within the projected timeline
  • Scope of Work:
    > Power-washed the existing metal roof to remove debris and ensure optimal surface preparation.
    > Applied Sika Liquid Plastics metal primer to the cleaned surface.
    >Reinforced all detail areas with self-adhesive tape for added durability.
    >Applied a full glass fibre reinforced Sikalastic® 625N, a 20-year liquid-applied waterproofing membrane, to ensure long-lasting protection.

Challenges and Solutions

The Turner Street project posed unique challenges due to its location in Manchester city centre. The one-way, narrow streets necessitated exceptional traffic management and posed issues related to scaffold permits, delivery logistics, and parking availability. These obstacles required meticulous planning and coordination to ensure seamless progress throughout the project.

  • Traffic Management: Our contracts team expertly managed traffic flow to minimize disruption and maintain safety.
  • Scaffold Permits: We secured all necessary permits promptly, avoiding potential delays.
  • Delivery and Parking: The team coordinated timed deliveries and secured limited parking to maintain a consistent workflow without impacting the surrounding businesses and residents.

Outcome

The Turner Street project was completed to our customary high standards, showcasing the exceptional skill and dedication of our contracts team. The quality of the work was recognised with a nomination for “Project of the Year,” underscoring our commitment to excellence.

The application of Sikalastic® 625N provided the client with a robust, 20-year waterproofing solution, ensuring the longevity and resilience of the roof. This project stands as a testament to Permicoat Ltd’s ability to navigate complex urban challenges while delivering outstanding results.

Conclusion

Permicoat Ltd’s Turner Street project highlights our comprehensive approach to project management, from handling logistical challenges to applying industry-leading waterproofing systems. We take immense pride in delivering superior work that upholds our reputation for quality and reliability.